一区二区三区国产好的精华液,国产卡一卡二无线乱码,国产一区二三区好的精华液,给我免费观看片在线观看中国,国产SSWWSSWW,国产卡一卡二卡三无线乱码新区,国产SUV精品一区二区6,国产尺码和欧洲尺码表2023,国产亚洲精品久久久久久国模美

ACEG’s First Investment in Yangtze River Bridge Project
  |  Updated: 2024-12-25  |  Views: 1768

Recently, ACEG won the S24 Hangzhou to Hefei Expressway Wuhu Taishan Road Yangtze River Bridge and Connection Works, which is ACEG's first investment in Yangtze River bridge project.

With total investment of about RMB15.5 billion Yuan, 48 months of construction period and 356 months of toll-charging period, it has 30.88km of main line and 14.35km of connection line. The starting point crosses with G4231 Nanjing–Jiujiang Expressway and the ending point with G4211 Nanjing–Wuhu Expressway with 4 toll stations and six locations of interconnection along the whole route.

Included in "Layout Planning of Crossing Passages for Yangtze River Trunk Line (2020-2035)", the project can effectively improve the local expressway network and promote economic and social development along the route. Upon completion, it will play an important role in implementing the national strategy of integration of Yangtze River Delta, promoting high-quality development of Yangtze River Economic Belt.

Since 2024, ACEG has focused on high-quality market development, and successively invested in a number of major franchise projects in Anhui province, achieving reasonable growth in quantity and effective improvement in quality, continuously accelerating ACEG’s development featuring transformation, high-quality and large-scale.